Featured Projects
We work on hundreds of projects each year and every one is important and unique. But some projects do a better job telling the story about who we are and what we do. We invite you to explore our featured projects below.
![3D model of a building sitting on top of building layout design](https://www.dillon.ca/wp-content/uploads/2024/02/3d-rendering-of-house-in-top-of-plans-550x367.jpg)
Energy Management Strategy – NT
![Kids skating and biking in skate park](https://www.dillon.ca/wp-content/uploads/2024/02/kids-using-skate-park-550x367.jpg)
Valley Park Skatepark – Hamilton, ON
![Residence building showing recladding work](https://www.dillon.ca/wp-content/uploads/2024/02/completed-recladding-2-550x550.jpg)
Saint Mary’s University Loyola Tower Recladding – Halifax, NS
![drone photo of waterfront campus](https://www.dillon.ca/wp-content/uploads/2024/02/drone-photo-of-waterfront-campus-550x309.jpg)
NSCC Waterfront Campus Redevelopment – Sydney, NS
![Aerial view of City of Guelph downtown area](https://www.dillon.ca/wp-content/uploads/2024/02/city-of-Guelph-550x367.jpg)
Solid Waste Management Master Plan: Individual Producer Responsibility Tool – Guelph, ON
![partially flooded highway](https://www.dillon.ca/wp-content/uploads/2024/02/partially-flooded-road-550x367.jpg)
Long Term Impacts of Climate Change on the New Brunswick Transportation Network – NB
![Aerial view of Hamilton, Ontario](https://www.dillon.ca/wp-content/uploads/2024/02/Hamilton-ontario-550x367.jpg)
Eastern Ontario Transportation Planning Study – ON
![Waste bins for separating waste into proper receptacles](https://www.dillon.ca/wp-content/uploads/2024/02/waste-bins-550x367.jpg)
Public Spaces Waste Management Strategy – Langley, BC
![Woman putting paper cup in waste bin](https://www.dillon.ca/wp-content/uploads/2024/02/waste-disposal-options-550x367.jpg)
Future Waste Disposal Options Study – Kawartha Lakes, ON
![rolling out cover on a curve](https://www.dillon.ca/wp-content/uploads/2024/02/rolling-geo-on-curve-550x367.jpg)
Contract Administration and Construction Inspection for PTH 59 (US Border to PR 403) – MB
![flood protection](https://www.dillon.ca/wp-content/uploads/2024/02/20190217_142818-550x367.jpg)
Britannia Heritage Shipyard Flood Protection Improvements – Richmond, BC
![Road reconstruction after sewer line installation](https://www.dillon.ca/wp-content/uploads/2024/02/road-reconstruction-550x367.jpg)
Arthur Sanitary Trunk Sewer and Road Reconstruction – Guelph, ON
![Pump gallery](https://www.dillon.ca/wp-content/uploads/2024/02/huron-highlift-pump-gallery-550x367.jpg)
Asset Management Plans for Lake Huron and Elgin Area Water Supply Systems – ON
![new PTH 16 Bridge over the Assiniboine River an east road alignment](https://www.dillon.ca/wp-content/uploads/2024/02/new-pth-16-bridge-over-the-assiniboine-river-and-east-road-alignment-550x367.jpg)
Bridge over Assiniboine River on PTH 16 – MB
![Drone photo of quarry](https://www.dillon.ca/wp-content/uploads/2024/02/drone-photo-of-quarry-3-550x367.jpg)
Crown Land Aggregate Quarry Liability Assessment – MB
![Atlantic First Nations Water Authority office](https://www.dillon.ca/wp-content/uploads/2024/02/atlantic-first-nations-water-authority-office-550x367.jpg)
Development of Asset Management Plans – Atlantic Canada
![Aerial view of the Thames river and valley parkway](https://www.dillon.ca/wp-content/uploads/2024/02/aerial-view-of-the-Thames-river-550x367.jpg)
Thames Valley Parkway – North Branch Connection – London, ON
![](https://www.dillon.ca/wp-content/uploads/2024/02/storymap_banner-550x367.jpg)
Our Plan Toronto – Toronto, ON
![cyclist riding down Dundas Street](https://www.dillon.ca/wp-content/uploads/2024/02/cyclist-on-Dundas-Place-550x367.jpg)
Dundas Place – London, ON
![view of the hamlet of Baker Lake, Nunavut](https://www.dillon.ca/wp-content/uploads/2024/02/Baker-Lake-550x367.jpg)