Dillon Clients included on Canada's Top 100 Projects List

ReNew Canada released its 2017 Top 100 Projects. Four of the top 100 infrastructure projects in Canada include key work by Dillon. Our team added expertise to the following projects and would like to congratulate our partners on these projects.

  • City of Toronto/Waterfront Toronto - F.G. Gardiner Expressway: Dillon led the Individual Environmental Assessment for the future of the eastern portion of the Gardiner Expressway and Lake Shore Boulevard from Lower Jarvis Street to just east of the Don Valley Parkway (DVP).
  • Province of Manitoba - East Side Transportation Initiative: Dillon provided engineering support for the All-season Roads along Lake Winnipeg.
  • City of Winnipeg, Southwest Rapid Transitway (Stage 2) and Pembina Highway Underpass Project: Dillon provided alignment review and analysis for the Southwest Transitway and is serving as the owner's advocate. 
  • NSP Maritime Link Inc. - Maritime Link Project: Dillon developed plans for environmental protection, emergency response, and erosion and sediment control; environmental risk assessments, environmental/geotechnical due diligence site assessments, and environmental inspections during construction of five electrical transmission infrastructure sites along the route of the 500 MW transmission system.
P1 - B1 Winnipigow River Bridge